FLEXIPACK FACTORY & ACCOMMODATION
FACTORY, RESIDENTIAL AND SOCIAL HALL
Client: LOTUS
Location: Agbara, Nigeria
Project status: Completed 2021
Area: 160,765.04m2.
The Project consists of highest standard special customized MEP systems for this type of industrial area and includes preliminary engineering and detailed design, procurement, installation, testing and commissioning, training, as built documentation, operation & maintenance manuals, defect liability period.
Fire Protection:
Sprinkler, Hydrant, Standpipe, Hose reels.
Plumbing:
Water Treatment Plant, Water Supply, Drainage, Irrigation System.
Telecommunication:
Telephony System, Data Network, Fire Detection and Voice Alarm System.
Electrical:
Power supply, 27,000A Synchronize panel, LV Equipment, Power distribution, high bay Lighting, Lightning and Earthing Protection, MCC & MCP
Instrumentation and control:
Installation and pre-recommissioning of all instruments, power and signal cables for production line.
NDONI ROYAL HOTEL
EIGHT FLOORS HOTEL & CONFERENCE CENTER -
ELECTRICITY, HVAC, FIRE PROTECTION, PLUMBING & TELECOMMUNICATION
Client: HEAMETAGE OVERSEA CORPORATION
Location: Ndoni, River State, Nigeria
Project status: Completed 2021
Project characteristics: 5 stars Hotel with 86-nos Guest rooms, 3nos suite and conference Hall
The Project includes preparation of detailed and as build design, procurement of all the equipment and materials, construction, commissioning, training of client’s personnel and other post-construction services for the high and low voltage systems, HVAC systems, and mechanical (Portable and wastewater, drainage and firefighting) systems.
ELECTRICAL:
Power supply, HV Equipment, 750KVA 11/0.415KV Transformer, LV Equipment, Power Installation, Lighting, Lightning and Earthing Protection, MCC & MCP and 3nos of 750kva standby generators
HVAC:
Central A/C system consists of 3nos of 30Tons Chillers units, Chilled water pump station, Fan coil units’ system and Split Units system.
Fire Protection:
Fire Hydrant System and Argon Gas Extinguishing Systems
Plumbing:
Water Supply, Sewage System, Drainage.
Telecommunication:
Telephony System, Data Network, Fire Detection, Access Control, Cable TV.
NNPC TOWERS
HVAC REFURBISHMENT & BMS IMPLEMENTATION
Client: NNPC
Location: Abuja, Nigeria
Project status: Completed 2022
Project characteristics: Replacement of 14 Chillers ( 385TR/Each ) and 85 Air Handling Units AHUs connected to the chiller units in all floors of the towers.
Implementation with Variable Frequency Drivers, room Variable Air Diffusers and Building Management System for HVAC, Pumps, Main electrical Panels and UPSs.
The main objective of the project is to produce improved air quality, reduce power consumption and monitor and control the system from a control room.
The project Includes surveillance, design, procurement and installation, commissioning, training of client’s personnel and other post-construction services.